nntp2http.com
Posting
Suche
Optionen
Hilfe & Kontakt

Re: Metrolink Matters:- City Centre Reopening for 2 November

Von: Cheeky (me@privacy.net) [Profil]
Datum: 05.11.2009 00:37
Message-ID: <u144f5tkfout5rcd7j4d4cvlp5onoh7tq1@4ax.com>
Newsgroup: uk.railway
On Wed, 04 Nov 2009 00:40:12 +0000, Daniel Smith
<dasy2k1@invalid.invalid> wrote:


>yes but in Amsterdam they have points and crossing frogs with shallow
>flanges that raise the tread away from the railhead over those
>crossings, the flanges bearing all the weight,
>this drastically reduces noise and prolongs life compared with the way
>such things are done in the uk (ok Blackpool still use this system as
>did many first gen tramways)
>this would aslo solve the problem of the machine gun noise on NET where
>the lines diverge for the one way section

I suppose that begs the question "why don't we do it here then?".

[ Auf dieses Posting antworten ]